The  Swartz Creek Community School bond construction has been moving forward during the pandemic and the Oversight committee has some exciting updates to share. The bond spending is about 50% complete and the district has made significant progress on many projects. 

SCCS Elementary Update

The following projects have been completed at our elementary schools:

  • New STEAM Innovation Spaces
  • New Office Additions
  • Renovated Student Bathrooms
  • Replaced Main Entry Doors  
  • Replaced Exit Doors  
  • Replaced Corridor Ceilings 
  • Replaced Classroom Ceilings 
  • Replaced/Add Classroom Cabinetry 
  • Climate Controlled Buildings (Air Conditioning)  
  • Renovated Existing Security Site Lighting   
  • Upgraded Emergency/Exit Lighting  
  • Replaced Fire Alarm System 
  • Replaced Corridor Lighting Fixtures 
  • Replaced Classroom Lighting Fixtures 
  • Replaced Master Clock System

The following elementary school projects are still in progress:

  • Climate Control at Gaines 
  • 3M Safety Glass Film on backorder for areas of entry. 
  • Dieck & Morrish Elementary site work needs to be completed.(Parking lot and asphalt replacement) 
  • Maker Space equipment ordered. (3D Printers, Robotic equipment, Coding equipment) 

SCCS Athletic Complex

The SCCS Athletic complex is now complete with an all new field turf, scoreboard, home bleachers, home press box, new concession stand, home team bathrooms, fencing, new entrance, eight lane track, long jump, shot and discuss area. The complex can now be utilized by the soccer, lacrosse, and football teams. There is also a new team room where the players can use during pregame and halftime breaks. The new athletic complex looks amazing and is something the community should be proud of!

SCCS Administration Building

The new administration building is 80% complete and will be completed very soon. New office space, updated interior and a large meeting space will accommodate board of education meetings and allow for increased public attendance. The new office space will consolidate the SCCS administration into one building and that will foster greater collaboration and communication.  

Swartz Creek Middle School 

After the 2020-2021 school year concludes, the following projects will begin in the summer:

  • New construction will start on both the STEAM Innovation Wing and Office space. 
  • Exterior buildings are scheduled to be completed by end of summer. Interior  work on buildings will start in Fall of 2021.
  • Air Conditioning will be installed in the building during the summer of 2021.

The following projects will begin during spring/summer of 2022:

  • Renovate Student Bathrooms 
  • Renovate Staff Bathrooms 
  • Replace Main Entry Doors 
  • New Emergency Egress Windows  
  • Replace Exit Doors 
  • Add New Student Lockers
  • Replace Folding Partition Walls W/Fixed Walls  
  • Renovate Existing Office For Student Commons 
  • Replace Corridor Ceilings 
  • Renovate Existing Locker Rooms 
  • Renovate And Update Band And Choir Rooms 
  • Replace/Add Classroom Cabinetry
  • Replace Roof
  • Climate Control Building (Air Conditioning) 
  • Renovate Existing Security Site Lighting  
  • Upgrade Emergency/Exit Lighting 
  • Replace Fire Alarm System
  • Replace Corridor Lighting Fixtures 
  • Replace Master Clock System

Swartz Creek High School 

After the 2020-2021 school year concludes, the following projects will begin in the summer:

  • New construction will start on both the STEAM Innovation and Learning addition and new Office space. 
  • Exterior buildings scheduled to be completed by end of summer. Interior  work on buildings will start in Fall of 2021.
  • Air Conditioning will be installed in the building during the summer of 2021.

The following projects will begin during spring/summer of 2022:

  • Renovate Student Bathrooms  
  • Renovate Staff Bathrooms 
  • Replace Main Entry Doors 
  • New Emergency Egress Windows   
  • Replace Exit Doors
  • Add New Student Lockers  
  • Replace Corridor Ceilings 
  • Renovate Existing Locker Rooms  
  • Replace/Add Classroom Cabinetry   
  • Renovate Existing Gymnasium 
  • Replace Bleachers And Remove Stage In Gym 
  • Replace Roof   
  • Climate Control Building (Air Conditioning)  
  • Renovate Existing Security Site Lighting
  • Upgrade Emergency/Exit Lighting
  • Replace Fire Alarm System
  • Replace Corridor Lighting Fixtures

SCHS Site Work 

  • Reconstruct Safe Parking And Traffic Systems 
  • New Fencing/Gates Around Fields And Lots 
  • New Concrete Walkways